Time logged: 89:30
- Entry Time spent
- Trim motor install 0:30
- Elevator rivet filling 0:30
- Elevator trim tab install 2:00
- Trim motor wiring 1:00
- Mounting elevator tip 6:00
- Elevator tip forming and shortening rivets 2:00
- Elevator bottom skin, and trim motor hardware 3:00
- Elevator trim tab fitting problem 1:00
- Elevator skin fitting and safety wire 2:00
- Elevator skin prep and inspection hatch 2:00
- Vertical stabilizer complete 1:30
- Vertical stabilizer wiring 1:30
- Elevator rib1 rework and spar 2:00
- Vertical stabilizer rib1 and skin work 3:00
- Wiring delphi connector for tail light 1:30
- Vertical stabilizer spar riveting 1:30
- Horizontal Stabilizer Close 5:00
- Elevator spar part 1 4:00
- HS skin dimple and cleco 4:00
- HS skin dimple attempt 1:30
- HS spar riveting and skin prep (kinda) 3:00
- Clecoing and adjust HS front spar 2:00
- Back to HS front spar 3:00
- Starting on vertical stablizer 8:00
- Installing Taillight 1:00
- Rudder assemby 10:00
- Horizontal stablizer spar 3:00
- Balance counterweigh assembly & main spar 6:00
- Countersink, more cleaning, and clecoing 2:00
- Parts cleaning and priming 3:00
- Empennage arrived!! 3:00