Fuselage 28
Time logged: 134:40
- Entry Time spent
- Fuselage misc: rivet filling, countersink and throttle quadrant 2:30
- Installed ELT 1:30
- Side skin misc: sound proofing and air channel sealing 2:00
- NACA Duct & Static port 3:00
- Rear fuselage: luggage door and seat stop brackets 1:30
- Rear fuselage: covering the remaining top skin 0:45
- Side skin part 3 7:00
- Side skin continued 4:00
- Starting to install side skin 2:20
- Fitting control rods & rear seat channel 12:00
- Throttle quadrant 4:20
- Fitting control rods & prepping side skin 25:00
- Center fuselage connection and bottom floor skin 3:00
- Adding rudder pedals 2:30
- Building rear seats 6:00
- Center fuselage connection prep 4:00
- Center fuselage: ribs and floor skin 7:30
- Rear fuselage: covering (half of) the top skin 2:30
- Rear fuselage: Misc work before closing the top skin 2:30
- Starting center fuselage: rear spar and main spar 1:15
- Front row seats 5:00
- Starting center fuselage: rear spar and main spar 3:00
- Rear fuselage: luggage area, static port, GMU 11 4:00
- Rear fuselage: a problem with luggage floor skin 1:30
- Rear fuselage skin & fixing a damaged inner skin 10:00
- Rear fuselage rib assembly 5:00
- Rear fuselage: rib 2,3,4,5 and longeron 8 5:00
- Starting on rear fuselage: rib 6,7,8,9 6:00