~left_tank 6
Time logged: 26:30
- Entry Time spent
- Left tank: part 3 (leak test and install) 3:30
- Left tank: part 2 (Sealing back channel) 4:00
- Left tank, part 1 (Sealing ribs and skin) 10:00
- Left tank match drilling, left wing root trailing edge 3:00
- Left wing: landing light cover and fuel level sender 2:00
- Mocking left tank and filling rivets 4:00