~rear_fuselage 17
Time logged: 60:25
- Entry Time spent
- Finishing luggage door and designing throttle quadrant label 2:30
- Luggage area carpeting continued 6:00
- Some riveting, and starting on carpet (luggage extension) 4:30
- Rudder cable guides 0:35
- Installed the luggage door 0:45
- Bolted the rear parachute cable 4:00
- Rear fuselage: pulling rivets 3:20
- Rear fuselage: luggage door and seat stop brackets 1:30
- Rear fuselage: covering the remaining top skin 0:45
- Rear fuselage: covering (half of) the top skin 2:30
- Rear fuselage: Misc work before closing the top skin 2:30
- Rear fuselage: luggage area, static port, GMU 11 4:00
- Rear fuselage: a problem with luggage floor skin 1:30
- Rear fuselage skin & fixing a damaged inner skin 10:00
- Rear fuselage rib assembly 5:00
- Rear fuselage: rib 2,3,4,5 and longeron 8 5:00
- Starting on rear fuselage: rib 6,7,8,9 6:00