Vertical stabilizer spar riveting
Today is another easy day. I worked on vertical stablizer (VS-ASS-001-C-F-0-A-6
sheet 20).
TLDR
- Clecoed VS assembly minus skin
- Reamed a few holes
- Riveted VS assmebly minus Rib 1 and Rib 5
Walk through
Yesterday I cleaned my work bench and moved the horizontal stabilizer to the shelf/stand thing. So today I had plenty of space to work on new parts.
Since I am wait on replacement parts on both VS and elevator, I know I can’t finish either. I decided to work on VS for as much as I can because this part is slight easier.
All parts are already cleaned deburred and primed, so my job today was pretty straightforward. I followed the instruction on sheet 20 and clecoed the ribs and spars together to ensure all holes are aligned. Then I used a 4.0mm rivet to test fit all holes. 3 holes needed reaming so I did that and vacuumed/deburred the aluminum dust.
Then I started to put the rivets on. I paid special attention to not rivet rib1 and rib5, because rib1 in my kit was defective and I’m waiting for a replacement part. Rib1 connects to rib5, so I skipped rib5 too.
Overall, it’s a quick task and I did not run into any weird issues.
After the work, I took some pictures and called it a day.