WG-AFT-003-L-F-0 5 Left tank: part 3 (leak test and install) Sep 22, 2024 Left tank: part 2 (Sealing back channel) Sep 15, 2024 Left tank, part 1 (Sealing ribs and skin) Sep 8, 2024 Left tank match drilling, left wing root trailing edge Sep 5, 2024 Left wing: landing light cover and fuel level sender Aug 28, 2024