Timeline
- 19 Nov Fitting control rods & prepping side skin
- 09 Nov Center fuselage connection and bottom floor skin
- 08 Nov Adding rudder pedels
- 03 Nov Building rear seats
- 01 Nov Center fuselage connection prep
- 31 Oct Undercarriage: nose wheel and front fork
- 28 Oct Center fuselage: ribs and floor skin
- 24 Oct Rear fuselage: covering (half of) the top skin
- 19 Oct Rear fuselage: Misc work before closing the top skin
- 16 Oct Starting center fuselage: rear spar and main spar
- 15 Oct Matco brake upgrade
- 14 Oct Front row seats
- 13 Oct Starting center fuselage: rear spar and main spar
- 10 Oct Rear fuselage: luggage area, static port, GMU 11
- 09 Oct Rear fuselage: a problem with luggage floor skin
- 08 Oct Rear fuselage skin & fixing a damaged inner skin
- 04 Oct Rear fuselage rib assembly
- 28 Sep Rear fuselage: rib 2,3,4,5 and longeron 8
- 24 Sep Starting on rear fuselage: rib 6,7,8,9
- 22 Sep Left tank: part 3 (leak test and install)
- 19 Sep Left wing: aileron and flap fully riveted
- 18 Sep Left wing: nav light is on
- 16 Sep Left wing: wing tip
- 15 Sep Left tank: part 2 (Sealing back channel)
- 12 Sep Remaking left landing light cover - Part 2
- 08 Sep Left tank, part 1 (Sealing ribs and skin)
- 05 Sep Left tank match drilling, left wing root trailing edge
- 03 Sep Left wing skin misc clean up, and discussing panel with MPB
- 01 Sep Completing the right fuel tank
- 29 Aug Remaking left landing light cover - Part 1
- 28 Aug Left wing: landing light cover and fuel level sender
- 25 Aug Mocking left tank and filling rivets
- 17 Aug Right wing: lights and lens, wing tip and wing stand
- 11 Aug Prosealing the right fuel tank, left wing leading edge & lights
- 03 Aug Left top skin, and landing lights
- 29 Jul Misc work, but mostly fuel tank
- 27 Jul Right leading edge and fuel tank prep
- 14 Jul Right leading edge done
- 08 Jul Built the left flap
- 07 Jul Fuselage kit arrived, and left aileron
- 04 Jul Installing pitot tube
- 02 Jul Left bottom skin riveted
- 30 Jun Left bottom skin clecoed, and some rivet drilling
- 29 Jun Right aileron, flap, trailing edge, and left spar
- 24 Jun Right leading edge skin damage
- 23 Jun Lots of things going on the right wing, and starting on the left
- 19 Jun Right aileron part prep
- 18 Jun Right leading edge done
- 17 Jun Clecoing left ribs, and update on rivet gun
- 16 Jun Right top skin and leading edge
- 14 Jun Rib 9 fix, and starting right top skin
- 11 Jun right wing harness
- 09 Jun Working on right top skin and left ribs
- 07 Jun Right bottom skin riveted
- 05 Jun Right bottom skin fitting and an successful experiment
- 04 Jun Right spar assembly 4 complete, started assmebly 3
- 01 Jun Starting to rivet ribs to spar
- 31 May Cleaning left ribs, and found a crack
- 30 May Right wing ribs, and lots of debur
- 27 May Getting started on the right wing (rear spar and a few ribs)
- 18 May Wing kit and dimple template
- 10 May Misc non-build updates
- 13 Mar Trim motor install
- 09 Mar Elevator rivet filling
- 01 Mar Elevator trim tab install
- 29 Feb Trim motor wiring
- 28 Feb Mounting elevator tip
- 25 Feb Elevator tip forming and shortening rivets
- 22 Feb Elevator bottom skin, and trim motor hardware
- 20 Feb Elevator trim tab fitting problem
- 18 Feb Elevator skin fitting and safety wire
- 17 Feb Elevator skin prep and inspection hatch
- 14 Feb Vertical stabilizer complete
- 09 Feb Vertical stabilizer wiring
- 08 Feb Elevator rib1 rework and spar
- 07 Feb Vertical stabilizer rib1 and skin work
- 06 Feb Wiring delphi connector for tail light
- 03 Feb Vertical stabilizer spar riveting
- 02 Feb Horizontal stabilizer and elevator stand
- 30 Jan Horizontal Stabilizer Close
- 26 Jan Wire standoff and EAA Tech Counseling visit
- 21 Jan Elevator spar part 1
- 20 Jan HS skin dimple and cleco
- 16 Jan HS skin dimple attempt
- 14 Jan HS spar riveting and skin prep (kinda)
- 13 Jan Clecoing and adjust HS front spar
- 12 Jan Back to HS front spar
- 11 Jan Starting on vertical stablizer
- 11 Jan Installing Taillight
- 29 Dec Rudder assemby
- 24 Dec Horizontal stablizer spar
- 21 Dec Balance counterweigh assembly & main spar
- 18 Dec Countersink, more cleaning, and clecoing
- 15 Dec Parts cleaning and priming
- 11 Dec Empennage arrived!!
- 04 Nov DRDT-2 Stand
- 16 Oct DRDT-2
- 01 Oct Builing EAA 100 WorkBench
- 17 Sep Priming experiment
- 03 Sep Alodining and priming
- 02 Sep Day 1, setting up this site!