Timeline
- 26 Mar 2:30 Engine Harness - Part 6 - Fixing harness wires & testing Engine
- 21 Mar 1:30 Propeller - Part 3 Engine
- 21 Mar 2:00 Engine Harness - Part 5 - Debugging CAN wires Engine
- 14 Mar 10:00 Engine Harness - Part 4 - Continue with Wiring Investigation Engine
- 07 Mar 1:00 Propeller - Part 2 Engine
- 28 Feb 2:00 Propeller - Part 1 Engine
- 27 Feb 6:00 Engine Harness - Part 3 - Wiring Issue Engine
- 20 Feb 4:00 Installing Throttle Cable Engine
- 07 Feb 4:00 Making Sensor Connectors & PCV Mount Engine
- 07 Feb 3:20 Fuselage rivet filling Fuselage
- 01 Feb 3:00 Engine Harness - Part 2 - Starter Cables and Fuel Pressure Sender Engine
- 01 Feb 1:00 Engine Harness - Part 1 - Fusebox and Starter Engine
- 01 Feb 2:00 Engine Cowling Prep Engine
- 31 Jan 2:30 ECU & HIC Fuselage
- 19 Jan 3:00 Painting Window Trim and Working on Fuel Pressure Sensor Canopy
- 19 Jan 1:30 Cowling Spacing Jig Engine
- 17 Jan 0:45 Installing new Master Relay Firewall
- 17 Jan 1:30 Attaching the Engine - Part 2 Engine
- 11 Jan 2:20 Painting Window Trim - Part 2 Canopy
- 11 Jan 3:30 Attaching the Engine - Part 1 Engine
- 10 Jan 1:00 Painting Window Trim Canopy
- 10 Jan 4:20 Firewall Wiring Cleanup, and Master Relay Firewall
- 04 Jan 1:00 New Door Handles Canopy
- 02 Jan 4:20 Firewall Wiring and Heater Hose Cleanup Firewall
- 01 Jan 2:00 Installing Passenger Row Floor Fuselage
- 31 Dec 2:40 Bleeding Brakes - Part 2 Undercarriage
- 26 Dec 1:30 Built the Engine Lift Engine
- 26 Dec 1:00 Continued on Brake Bleeding and Started on ECU Fuselage
- 25 Dec 0:45 Brake Lines on Throttle Quadrant Fuselage
- 25 Dec 1:30 Bleeding Brakes (1st Attempt) Undercarriage
- 24 Dec 1:00 Making Throttle Cable Connection Rod End Fuselage
- 24 Dec 2:00 Misc work to Prepare for Engine Install Engine
- 19 Dec 2:30 Regulator B Ground Wire & Misc Clean Up Firewall
- 13 Dec 4:00 Starter Relay and Fusebox, Regulator Firewall
- 06 Dec 3:45 Misc Work on Firewall Forward Firewall
- 28 Nov 4:00 Adjusting Fuel Selector and Fuel Lines Fuselage
- 22 Nov 4:00 Fuel Selector Install Fuselage
- 21 Nov 1:30 Protecting Throttle Quadrant with Vinyl Fuselage
- 16 Nov 2:40 Completed the Fuel Pumps & Naviflow Assembly Firewall
- 01 Nov 1:30 Rotax Fuel Pumps wiring and Installing to Firewall Firewall
- 24 Oct 4:00 Building the Fuel Pumps and Naviflow Firewall
- 19 Oct 3:00 Fuel Selector Fittings Fuselage
- 19 Oct 3:00 Completed ELT Wiring Fuselage
- 18 Oct 4:00 Moving Engine to Hangar Engine
- 18 Oct 4:00 Odds and Ends on Canopy Canopy
- 12 Oct 9:00 Installing the windshield Canopy
- 12 Oct 0:45 Dispose Canopy Crate Misc
- 11 Oct 0:50 Installing doors Canopy
- 05 Oct 8:00 Copilot door window Canopy
- 04 Oct 4:30 Rear floor shutoff skin and transponder antenna hole cover Fuselage
- 27 Sep 6:00 Pilot Door Window: Part 2 Canopy
- 26 Sep 1:00 Pilot Door Window: Part 1 Canopy
- 25 Sep 0:15 Checked GPS Antenna Installation Fuselage
- 21 Sep 4:30 Installing right rear window Canopy
- 14 Sep 6:00 Installing left rear window Canopy
- 06 Sep 2:00 Engine inspection and pallet jack Engine
- 31 Aug 2:00 Starting to prep rear windows Canopy
- 31 Aug 3:10 Door latch rail cover Canopy
- 24 Aug 1:00 Door latch center slide Canopy
- 24 Aug 2:00 Rebuilt battery cables, installed shunt cover Firewall
- 16 Aug 0:40 Rebuilt passenger door latch Canopy
- 16 Aug 5:20 Airmaster controller, FP1 connector Fuselage
- 09 Aug 0:30 Re-installing GTP 59 (OAT Probe) Wing
- 09 Aug 11:20 Installing Instrument Panel & Prepping Fuel Selector Fuselage
- 03 Aug 3:00 Closed the Top Front Skin Fuselage
- 27 Jul 5:00 Continuing Firewall Forward, 4 hours 4 screws Firewall
- 26 Jul 3:00 Installing Firewall Forward Parts Firewall
- 13 Jul 0:20 Installing GTP 59 (OAT Probe) Wing
- 04 Jul 4:00 Side upholstery panels Fuselage
- 03 Jul 10:00 Door latches Canopy
- 01 Jul 1:15 Fixed GMU11 connection Fuselage
- 29 Jun 5:00 First power on! Fuselage
- 29 Jun 2:40 Starting on door latch Canopy
- 28 Jun 2:00 Rear Fuselage Trim Cover Fuselage
- 28 Jun 6:00 Firewall Forward Wiring Firewall
- 27 Jun 2:30 Test fitting throttle quadrant Fuselage
- 27 Jun 3:00 Installing back side skin Fuselage
- 26 Jun 3:00 Center console work Fuselage
- 25 Jun 8:00 Routing misc wires and fluid lines Fuselage
- 25 Jun 3:20 Wiring on the firewall forward Firewall
- 25 Jun 2:30 Finishing up trim motor and rudder cable Empennage
- 22 Jun 7:30 Final assembly: vertical stabilizer and rudder Empennage
- 21 Jun 8:00 Lots of things before putting on dashboard Fuselage
- 21 Jun 4:00 Rigging the elevator Empennage
- 20 Jun 40:00 Rotax engine service training Misc
- 15 Jun 1:30 Routing some more wires before instrument panel Fuselage
- 15 Jun 6:00 Side panel upholstery and floor doubler Fuselage
- 14 Jun 7:00 Test fitting instrument panel and more prep: cabin heater work, upholstery etc Fuselage
- 13 Jun 2:00 Preparing instrument panel fitting Fuselage
- 13 Jun 1:00 Elevator push rod Empennage
- 12 Jun 2:00 Installed the elevator Empennage
- 10 Jun 3:00 Mounting control stick wiring connector to airframe Fuselage
- 09 Jun 6:00 Boost pump controller, cabin heat duct, and upholstery Fuselage
- 09 Jun 2:00 Re-installing boost pumps Wing
- 05 Jun 0:20 Airmaster propeller inventory Firewall
- 29 May 4:00 Routing avionics harness Fuselage
- 29 May 1:00 Remove Boost Pumps Wing
- 16 May 3:00 Takes a village... flaring fuel lines Wing
- 10 May 2:00 Installing the rear seat stoppers Fuselage
- 10 May 0:40 Comm2 Antenna Fuselage
- 10 May 1:00 Cabin heater ducts Fuselage
- 30 Apr 3:00 Cabin heather assembly Fuselage
- 30 Apr 2:30 Fuel boost pump plumbing test Wing
- 25 Apr 1:00 Installing horizontal stabilizer Empennage
- 19 Apr 5:00 Front inner skin Fuselage
- 13 Apr 0:20 NotebookLM Misc
- 01 Apr 7:40 Audio jack issues Fuselage
- 29 Mar 2:00 Audio jack ground loop(??) Fuselage
- 28 Mar 6:00 EAA Tech Counsel on Fuselage Work Misc
- 26 Mar 13:00 Boost Pump Upgrade Wing
- 19 Mar 5:00 Moving fuselage to the hangar Misc
- 13 Mar 7:30 Wiring harness (part 5): Antennas and more wires Fuselage
- 12 Mar 1:00 Cold air ducts Fuselage
- 06 Mar 3:00 Wiring harness (part 4) & coax Fuselage
- 05 Mar 12:00 Continue on wiring harness (part 3) Fuselage
- 02 Mar 3:20 Leather seat & throttle quadrant vinyl part 2 Fuselage
- 28 Feb 1:30 Leather seat! And throttle quadrant vinyl Fuselage
- 27 Feb 4:00 Continue on wiring harness Fuselage
- 26 Feb 3:20 Working on avionics rack Fuselage
- 25 Feb 9:00 Preparing for top front skin installation Fuselage
- 19 Feb 2:30 Finishing luggage door and designing throttle quadrant label Fuselage
- 18 Feb 2:00 Routing harness part2: wing connectors and GTR 205xR Fuselage
- 17 Feb 3:00 Starting to route harness, and relocating ELT Fuselage
- 12 Feb 6:00 Luggage area carpeting continued Fuselage
- 10 Feb 4:30 Some riveting, and starting on carpet (luggage extension) Fuselage
- 09 Feb 5:00 Moving wings to hangar Misc
- 08 Feb 10:30 Installing Antenna Mounting Plates Fuselage
- 06 Feb 5:00 Brake lines from gear leg and fuselage Undercarriage
- 03 Feb 0:35 Rudder cable guides Fuselage
- 02 Feb 4:00 Pilot side control stick Fuselage
- 01 Feb 2:30 Avionics rack support Fuselage
- 28 Jan 2:30 Autopilot Servos Fuselage
- 27 Jan 8:00 Seat belts Fuselage
- 26 Jan 0:45 Installed the luggage door Fuselage
- 25 Jan 3:00 Started to work on brake lines Undercarriage
- 24 Jan 4:00 Bolted the rear parachute cable Fuselage
- 23 Jan 6:00 Control joystick torque tube install Fuselage
- 20 Jan 2:30 Engine mount issue and rudder rod boot Firewall
- 19 Jan 0:25 She's on the ground! Misc
- 18 Jan 4:00 Installing the wheels Undercarriage
- 16 Jan 3:20 Rear fuselage: pulling rivets Fuselage
- 15 Jan 5:00 Canopy part 3: installation Canopy
- 14 Jan 4:00 Main landing gear shim Undercarriage
- 12 Jan 2:30 Fuselage misc: rivet filling, countersink and throttle quadrant Fuselage
- 11 Jan 10:00 Canopy part 2: fitting and drilling Canopy
- 09 Jan 1:00 Putting on the main landing gear Undercarriage
- 08 Jan 1:30 Installed ELT Fuselage
- 06 Jan 1:40 Firewall mounting part 2: fire barrier and naviflow Firewall
- 05 Jan 2:00 Side skin misc: sound proofing and air channel sealing Fuselage
- 03 Jan 3:00 NACA Duct & Static port Fuselage
- 02 Jan 6:00 Canopy part 1: paint and wiring Canopy
- 01 Jan 1:30 Rear fuselage: luggage door and seat stop brackets Fuselage
- 31 Dec 0:45 Rear fuselage: covering the remaining top skin Fuselage
- 30 Dec 1:30 Landing wheels Undercarriage
- 29 Dec 16:00 Building the nose gear assembly Undercarriage
- 25 Dec 6:00 Firewall mounting part 1 Firewall
- 23 Dec 7:00 Side skin part 3 Fuselage
- 22 Dec 4:00 Side skin continued Fuselage
- 21 Dec 2:20 Starting to install side skin Fuselage
- 20 Dec 12:00 Fitting control rods & rear seat channel Fuselage
- 17 Dec 4:20 Throttle quadrant Fuselage
- 19 Nov 25:00 Fitting control rods & prepping side skin Fuselage
- 09 Nov 3:00 Center fuselage connection and bottom floor skin Fuselage
- 08 Nov 2:30 Adding rudder pedals Fuselage
- 03 Nov 6:00 Building rear seats Fuselage
- 01 Nov 4:00 Center fuselage connection prep Fuselage
- 31 Oct 4:00 Undercarriage: nose wheel and front fork Undercarriage
- 28 Oct 7:30 Center fuselage: ribs and floor skin Fuselage
- 24 Oct 2:30 Rear fuselage: covering (half of) the top skin Fuselage
- 19 Oct 2:30 Rear fuselage: Misc work before closing the top skin Fuselage
- 16 Oct 1:15 Center fuselage: rib onto main spar Fuselage
- 15 Oct 0:45 Matco brake upgrade Undercarriage
- 14 Oct 5:00 Front row seats Fuselage
- 13 Oct 3:00 Starting center fuselage: rear spar and main spar Fuselage
- 10 Oct 4:00 Rear fuselage: luggage area, static port, GMU 11 Fuselage
- 09 Oct 1:30 Rear fuselage: a problem with luggage floor skin Fuselage
- 08 Oct 10:00 Rear fuselage skin & fixing a damaged inner skin Fuselage
- 04 Oct 5:00 Rear fuselage rib assembly Fuselage
- 28 Sep 5:00 Rear fuselage: rib 2,3,4,5 and longeron 8 Fuselage
- 24 Sep 6:00 Starting on rear fuselage: rib 6,7,8,9 Fuselage
- 22 Sep 3:30 Left tank: part 3 (leak test and install) Wing
- 19 Sep 1:00 Left wing: aileron and flap fully riveted Wing
- 18 Sep 1:00 Left wing: nav light is on Wing
- 16 Sep 3:00 Left wing: wing tip Wing
- 15 Sep 4:00 Left tank: part 2 (Sealing back channel) Wing
- 12 Sep 5:00 Remaking left landing light cover - Part 2 Wing
- 08 Sep 10:00 Left tank, part 1 (Sealing ribs and skin) Wing
- 05 Sep 3:00 Left tank match drilling, left wing root trailing edge Wing
- 03 Sep 2:30 Left wing skin misc clean up, and discussing panel with MPB Wing
- 01 Sep 3:00 Completing the right fuel tank Wing
- 29 Aug 6:00 Remaking left landing light cover - Part 1 Wing
- 28 Aug 2:00 Left wing: landing light cover and fuel level sender Wing
- 25 Aug 4:00 Mocking left tank and filling rivets Wing
- 17 Aug 12:00 Right wing: lights and lens, wing tip and wing stand Wing
- 11 Aug 15:00 Prosealing the right fuel tank, left wing leading edge & lights Wing
- 03 Aug 2:00 Left top skin, and landing lights Wing
- 29 Jul 2:00 Misc work, but mostly fuel tank Wing
- 27 Jul 8:00 Right leading edge and fuel tank prep Wing
- 14 Jul 4:00 Right leading edge done Wing
- 08 Jul 1:15 Built the left flap Wing
- 07 Jul 5:00 Fuselage kit arrived, and left aileron Wing
- 04 Jul 5:00 Installing pitot tube Wing
- 02 Jul 3:00 Left bottom skin riveted Wing
- 30 Jun 2:00 Left bottom skin clecoed, and some rivet drilling Wing
- 29 Jun 3:00 Right aileron, flap, trailing edge, and left spar Wing
- 24 Jun 1:30 Right leading edge skin damage Wing
- 23 Jun 9:00 Lots of things going on the right wing, and starting on the left Wing
- 19 Jun 2:00 Right aileron part prep Wing
- 18 Jun 2:00 Right leading edge done Wing
- 17 Jun 3:00 Clecoing left ribs, and update on rivet gun Wing
- 16 Jun 8:00 Right top skin and leading edge Wing
- 14 Jun 4:00 Rib 9 fix, and starting right top skin Wing
- 11 Jun 4:00 right wing harness Wing
- 09 Jun 2:20 Working on right top skin and left ribs Wing
- 07 Jun 3:00 Right bottom skin riveted Wing
- 05 Jun 5:30 Right bottom skin fitting and an successful experiment Wing
- 04 Jun 4:00 Right spar assembly 4 complete, started assmebly 3 Wing
- 01 Jun 3:00 Starting to rivet ribs to spar Wing
- 31 May 3:30 Cleaning left ribs, and found a crack Wing
- 30 May 7:00 Right wing ribs, and lots of debur Wing
- 27 May 6:00 Getting started on the right wing (rear spar and a few ribs) Wing
- 18 May 0:10 Wing kit and dimple template Wing
- 10 May 0:10 Misc non-build updates Misc
- 13 Mar 0:30 Trim motor install Empennage
- 09 Mar 0:30 Elevator rivet filling Empennage
- 01 Mar 2:00 Elevator trim tab install Empennage
- 29 Feb 1:00 Trim motor wiring Empennage
- 28 Feb 6:00 Mounting elevator tip Empennage
- 25 Feb 2:00 Elevator tip forming and shortening rivets Empennage
- 22 Feb 3:00 Elevator bottom skin, and trim motor hardware Empennage
- 20 Feb 1:00 Elevator trim tab fitting problem Empennage
- 18 Feb 2:00 Elevator skin fitting and safety wire Empennage
- 17 Feb 2:00 Elevator skin prep and inspection hatch Empennage
- 14 Feb 1:30 Vertical stabilizer complete Empennage
- 09 Feb 1:30 Vertical stabilizer wiring Empennage
- 08 Feb 2:00 Elevator rib1 rework and spar Empennage
- 07 Feb 3:00 Vertical stabilizer rib1 and skin work Empennage
- 06 Feb 1:30 Wiring delphi connector for tail light Empennage
- 03 Feb 1:30 Vertical stabilizer spar riveting Empennage
- 02 Feb 1:00 Horizontal stabilizer and elevator stand Misc
- 30 Jan 5:00 Horizontal Stabilizer Close Empennage
- 26 Jan 2:00 Wire standoff and EAA Tech Counseling visit Misc
- 21 Jan 4:00 Elevator spar part 1 Empennage
- 20 Jan 4:00 HS skin dimple and cleco Empennage
- 16 Jan 1:30 HS skin dimple attempt Empennage
- 14 Jan 3:00 HS spar riveting and skin prep (kinda) Empennage
- 13 Jan 2:00 Clecoing and adjust HS front spar Empennage
- 12 Jan 3:00 Back to HS front spar Empennage
- 11 Jan 8:00 Starting on vertical stabilizer Empennage
- 11 Jan 1:00 Installing Taillight Empennage
- 29 Dec 10:00 Rudder assembly Empennage
- 24 Dec 3:00 Horizontal stabilizer spar Empennage
- 21 Dec 6:00 Balance counterweigh assembly & main spar Empennage
- 18 Dec 2:00 Countersink, more cleaning, and clecoing Empennage
- 15 Dec 3:00 Parts cleaning and priming Empennage
- 11 Dec 3:00 Empennage arrived!! Empennage
- 04 Nov 2:00 DRDT-2 Stand Misc
- 16 Oct 0:45 DRDT-2 Misc
- 01 Oct 10:00 Builing EAA 100 WorkBench Misc
- 17 Sep 2:00 Priming experiment Misc
- 03 Sep 2:00 Alodining and priming Misc
- 02 Sep 3:00 Day 1, setting up this site! Misc