Installing Instrument Panel & Prepping Fuel Selector
TLDR Sealed the sides of the top front skin Started to prep fuel selector Installed dashboard and instrument panel (partially) Wires connected behind dashboard & powered on ...
TLDR Sealed the sides of the top front skin Started to prep fuel selector Installed dashboard and instrument panel (partially) Wires connected behind dashboard & powered on ...
TLDR Ran the wire looms for Airmaster prop controller Connected the lines for the front static ports Closed the top front skin Detail Prop wiring I wanted to run the wires for the prop ...
TLDR Installed the fule pump bracket Misc research work on fuel lines’’ Detail Fuel pump brakcet The fuel pump bracket for my installation is slightly different from the instruction in th...
TLDR Installed the bracket for oil tank Installed battery bracket Install the gascalator and naviflow base plate Detail Oil tank bracket Super easy to install. Clecoed the bracket on th...
TLDR Installed GTP59 on the right wing root inspection hatch Detail Sling’s official instruction says the OAT probe should be installed in the NACA duct, but most people say it measures 10+ ...
TLDR Installed side upholstery panels Detail Installing the side upholstery panels was not as daunting as they said. There were a lot of rivnuts though. On the back of the panel, they alrea...
TLDR Installed locks and latches on both doors Made a doubler for copilot side skin Detail Spent a couple of nights and full day today to install the locks and latches on both doors. The ...
TLDR Fixed GMU11 connection Dissembled the instrument panel Detail GMU11 During the first power on I could not get GMU11 data. By asking Midwest Panel Builders, they suggested to check po...
TLDR Connected the rest of wires for first power on Turned on power for the first time Debugged GMU11 Issue (to be continued) Detail Wiring In the morning, I connected the battery groun...
TLDR Built the door latch pushrod Detail With the GMU11 issue on pause waiting for parts, I switched to working on doors. THe first task on the KAI is to build the door latch pushrod. It’s...