Engine Cowling Prep
Engine Cowling Prep
TLDR
- Fit the cowling pieces together
Details
Cowing
I put the cowing 2 pieces pointing upwards, and aligned them to ensure the hole around spinner is connected together nicely. Then drilled holes 5.5mm away from the tip per instruction.
Then I lined up the rest of the cowling edge and drilled holes every 28.5 cm.
Then I took a marker to highlight the areas that needed some sanding before removing the clecos. I used a 60 grits sanding block and a sanding disc on a dremel to give the edges some light sanding.
After a few rounds sanding and checking, the cowing fits together seamlessly.
Modeling
This post is licensed under CC BY 4.0 by the author.