Post

Cowling Day5: Camlocs & Prepping the Inspection Doors

Cowling Day5: Camlocs & Prepping the Inspection Doors

TLDR

  • Installed camlocs

Details

Camlocs

Tools:

  • Snap ring tool
  • Camloc pliers
  • Countersink bit and 3.2mm countersink rivets.

I match drilled the camloc holes on both the upper and lower cowling, and installed the camlocs.

To make sure the precision is high, I fully installed camloc one at a time before drilling the next hole. So this process took quite a while.

Unfortunately, once I installed everything the bottom spacing between the cowling and the propeller hub became 4.8mm, which was less than the minimum 5mm.

I have to sand off the tip of the cowling a little. In order to preserve the strength, I will add some fiberglass+epoxy mix at the back.

Inspection Doors

After working on the whole cowling, the inspection door did not seem very difficult to do.

I placed the door on top of the cowling for a test fit first. There were some obvious places to be trimmed, which I marked out with a Sharpie.

Then I test fitted the piano hinge on the inspection door. Didn’t get time to really finish this work, will continue next week.

This post is licensed under CC BY 4.0 by the author.